01 26 54 - FORM FOR PRICE SUMMARY SBC Project Number: Project Name: East Hickman Vocational Building Name of General Contractor: Fellowship Construction Proposal Number: Date Itemized: 3-Dec-25 Page of pages Work by Subcontractors Name of Subcontractor Costs and Allowances Excavate Dirt for Fire line Peed Family 2,881.93 Subtotal: 2,881.93 General Contractor mark-up on Subtotal: 10.0000 % = 288.19 Subtotal for General Contractor for work by subcontractors: 3,170.12 Work by General Contractor Concrete Labor and Material 2,157.25 Subtotal (including Subcontractors and the General Contractor): 5,327.37 Cells with red underline (if viewed in color) Bond Premium: 2.0000 % = 106.55 are for you to fill in. Others are protected. Rounding off is permitted if rounding up for decreases and rounding down Total: 5,433.92 for increases. Math functions in Excel show rounded to nearest penny, but carry exact value for calculations. Let embedded math do its work. This spreadsheet is available on the Owner's Designers' Manual website. TN Higher Education - Standard Document - May 2018 Page 1of 1 01 26 55 - FORM FOR PRICE OF WORK SBC Project Number: Project Name: East Hickman Vocational Building Work ilemized below provided by: Fellowship Construction Proposal Number: Date Itemized: 3-Dec-25 Page 1 of 1 pages Description Material Equipment Labor Quantity Unit Cost Extension Quantity Unit Cost Extension Quantity Unit Cost Extension 150.00 900.00 0.00 0.00 Concrete 6 cy Concrete Labor 0.00 0.00 16 hr 55.00 880.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Materials Subtotal 900.00 Equipment Labor Subtotal 880.00 Cells with red underline (if viewed in color) 9,750 % Sales Tax = 87.75 % Burden = 0.00 are for you to fill in. Other cells are protected. Cost: 987.75 Cost: 0.00 Cost: 880.00 Rounding off is permitted if rounding up for decreases and rounding down for increases. Subtotal of Costs of Materials + Equipment + Labor = $ 1,867.75 Math functions in Excel show rounded to nearest penny, but carry exact value for calculations. 10% Overhead allowed on costs = $ 186.78 Lel embedded math in "extension" columns do its work. Subtotal of Costs + Overhead = $ 2,054.53 This spreadsheet is available on the Owner's Designers' Manual 5% Profit allowed on Costs + Overhead = $ 102.72 website. Total for this change = $ 2,157.25 TN Higher Education - Standard Document - May 2018 Page 1of 1 01 26 55 - FORM FOR PRICE OF WORK SBC Project Number: Project Name: East Hickman Vocational Building Work itemized below provided by: Peed Family Excavating Proposal Number: Date Itemized: 3-Dec-25 Page 1 of 1 pages Description Material Equipment Labor Quantity Unit Cost Extension Quantity Unit Cost Extension Quantity Unit Cost Extension 1 283.40 283.40 0.00 0.00 Materials PVC 20' stick Labor 0.00 0.00 23 hrs 51.00 1,173.00 Machine time 0.00 7 hrs 144.45 1,011.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Materials Subtotal 283.40 Equipment Labor Subtotal 1,173.00 Cells with red underline (if viewed in color) 9.750 % Sales Tax = 27.63 % Burden = 0.00 are for you to fill in. Other cells are protected. Cost: 311.03 Cost: 1,011.15 Cost: 1,173.00 Rounding off is permitted if rounding up for decreases and rounding down for increases. Subtotal of Costs of Materials + Equipment + Labor = $ 2,495.18 Math functions in Excel show rounded to nearest penny, but carry exact value for calculations. 10% Overhead allowed on costs = $ 249.52 Let embedded math in "extension" columns do its work. Subtotal of Costs + Overhead = $ 2,744.70 This spreadsheet is available on the Owner's Designers' Manual 5% Profit allowed on Costs + Overhead = $ 137.23 website. Total for this change = $ 2,881.93 TN Higher Education - Standard Document - May 2018 Page 1of 1 ## Table 1 | Work by Subcontractors | Name of Subcontractor | Costs and Allowances | | --- | --- | --- | | Excavate Dirt for Fire line | Peed Family | 2,881.93 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | ## Table 2 | Description | | | Material | | | | Equipment | | | | Labor | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | | Quantity | Unit | Cost | Extension | Quantity | Unit | Cost | Extension | Quantity | Unit | Cost | Extension | | Concrete | 6 | cy | 150.00 | 900.00 | | | | 0.00 | | | | 0.00 | | Concrete Labor | | | | 0.00 | | | | 0.00 | 16 | hr | 55.00 | 880.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0,00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0,00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | ## Table 3 | | | | --- | --- | | 10% Overhead allowed on costs = | $ 186.78 | | Subtotal of Costs + Overhead = | $ 2,054.53 | | 5% Profit allowed on Costs + Overhead = | $ 102.72 | | Total for this change = | $ 2,157.25 | ## Table 4 | Description | | | Material | | | | Equipment | | | | Labor | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | | Quantity | Unit | Cost | Extension | Quantity | Unit | Cost | Extension | Quantity | Unit | Cost | Extension | | Materials PVC 20' stick | 1 | | 283.40 | 283.40 | | | | 0.00 | | | | 0.00 | | Labor | | | | 0.00 | | | | 0.00 | 23 | hrs | 51.00 | 1,173.00 | | Machine time | | | | 0.00 | 7 | hrs | 144.45 | 1,011.15 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0,00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0,00 | | | | 0,00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | | | | | | 0.00 | | | | 0.00 | | | | 0.00 | ## Table 5 | of Costs of Materials + Equipment | | | --- | --- | | 10% Overhead allowed on costs = $ | 249.52 | | Subtotal of Costs + Overhead = $ | 2,744.70 | | 5% Profit allowed on Costs + Overhead = $ | 137.23 | | Total for this change = $ | 2,881.93 |