New Policy Click here to choose a school board. Monitoring: Descriptor Code: Issued Date: Descriptor Term: 3.211 Review: Annually, New Project Planning in October Rescinds: Issued: 1 SELECTION OF ARCHITECT¹ 2 The Board shall approve a registered architect for new projects of construction, expansion, and/or 3 maintenance as required by law. The Board shall execute a contract with such architect for each 4 project. 5 SELECTION OF ENGINEER¹ 6 Following the execution of a contract for architectural services, the architect or architectural firm shall 7 select a registered engineer for each project. 8 SITE SELECTION 9 The Board shall have sole discretion with choosing sites for construction. 2 When determining where to 10 begin new projects, the Board shall consider the current and future populations of the area, 11 transportation routes, and accessibility to utilities. 12 BUILDING ACCESSIBILITY³ 13 The construction, remodeling, renovation, expansion, or modification of a school building shall 14 comply with state and federal requirements regarding building accessibility. Legal References 1. TCA 62-2-107; TRR/MS 0520-01-04-.01(2) 2. TCA 49-2-203(a)(3); Rutherford County Board of Education v. Rutherford County Commission, 2000 Tenn. App. LEXIS 703 3. 28 CFR § 36.201; TRR/MS 0520-01-04-.01(1) Version Date: June 10, 2021 ## Table 1 | | Click here to choose a school board. | | | | --- | --- | --- | --- | | Monitoring: Review: Annually, | Descriptor Term: New Project Planning | Descriptor Code: 3.211 | Issued Date: | | in October | | Rescinds: | Issued: |