AIA® Document G701® - 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: East Hickman High School Contract For: Contruction Change Order Number: 004 Agricultural/Vocational Building 7700 TN-7 Date: 10-24-2025 Date: 05-06-2026 Lyles, TN OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Hickman County Schools Lyle Cook Martin Architects Fellowship Construction 114 North Central Avenue, Suite 203 310 Franklin Street 2668 Spencer Mill Road Centerville, TN 37033 Clarksville, TN 37040 Bon Aqua, TN 37025 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) An additional 1 day has been added to the substantial completion date for December 2025 due to weather delays. An additional 6 days have been added to the substantial completion date for January 2026 due to weather delays. An additional 7 days have been added to the substantial completion date for February 2026 due to weather delays. An additional 2 days have been added to the substantial completion date for March 2026 due to weather delays. An additional 5 days have been added to the substantial completion date for April 2026 due to weather delays. An additional 18 days have been added to the substantial completion date for Below-Grade utilities 8" Fire Line An additional 30 days have been added to the substantial completion date for Below-Grade utilities - Reroute Gas Line (wait for Board Approval) An additional 27 days have been added to the substantial completion date for Finish Floor Elevation modifications to footing details. See attached itemization. The original Contract Sum was $ 580,000.00 The net change by previously authorized Change Orders $ 22,901.76 The Contract Sum prior to this Change Order was $ 602,901.76 The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 602,901.76 The Contract Time will be increased by Ninety-Six (96) days. The new date of Substantial Completion will be 08-20-2026 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. BrodA.Martin ARCHITECT (Signature) CONTRACTOR June (Signature) Clu OWNER (Signature) Bradley A. Martin, III Jin Irwin Pres. (Printed name, title, and (Printed name and title) (Printed name and title) license number if required) May 7, 2026 5/8/2026 Date Date Date AIA Document G701 - 2017. Copyright © 1979, 1987, 2000, 2001 and 2017. All rights reserved "The American Institute of Architects," "American Institute of Architects,' "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 14:27:08 1 CDT on 05/07/2026 under Subscription No. .20250156901 which expires on 08/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com User Notes: (69aee075d218c3ad6312ada2) 01 26 25 - WEATHER DELAY REPORT Month and Year SBC Project Number and Project Name: Reported Below: East Hickman Vocational Building December 2025 Weather condition Work scheduled on critical path for this day Date causing delay that was delayed. 1 Rain Day- 0.12 Underground Utilities/ grading site 2 Rain Day- 0.55 Underground Utilities/ grading site 3 Dry out day Underground Utilities/ grading site 4 Rain Day- 0.34 Underground Utilities/ grading site 5 Dry out day Underground Utilities/ grading site 6 Dry out day Underground Utilities/ grading site 7 8 9 10 11 Dry out day Underground Utilities/ grading site 12 Dry out day Underground Utilities/ grading site 13 14 15 16 17 18 Rain Day- 1.05 Underground Utilities/ grading site 19 Dry out day Underground Utilities/ grading site 20 Dry out day Underground Utilities/ grading site 21 Dry out day Underground Utilities/ grading site 22 23 24 25 26 27 28 29 Rain day 0.18 Underground Utilities/ grading site 30 Dry out day Underground Utilities/ grading site 31 Total number of days this month with delay due to weather 12 days Baseline number from Section 01 26 20 11 days Total - Baseline = claimable days 1 days END OF SECTION TN Higher Education - Standard Document - May 2018 Page 1 of 1 Climatological Data for DICKSON, TN - December 2025 Temperature Date HDD CDD Maximum Precipitation New Snow Minimum Average Departure Snow Depth 2025-12-01 41 23 320 -11 5 33 0 0.12 00 0 2025-12-02 35 26 30.5 -127 34 n 0.55 00 0 2025-12-03 40 25 32.5 -10.5 a 0 000 00 0 2025-12-04 35 29 320 -108 33 0 0.34 00 0 2025-12-05 32 31 315 JIJ 33 0 0.00 00 D 2025-12-06 44 30 370 -53 28 0 0.00 00 0 2025-12-07 42 27 145 -76 30 0 0.00 00 0 2025-12-08 44 28 360 -5.9 19 0 0.00 00 0 2025-12-09 4b. 21 345 -72 30 0 0.00 00 0 2025-12-10 53 37 450 35 20 0 0.00 0.0 0 2025-12-11 42 22 320 -9.3 33 a 0.00 00 0 2025-12-12 55 34 44 5 34 20 0 0.00 00 0 2025-12-13 51 31 410 01 24 0 0.00 00 0 2025-12-14 38 12 250 -15.7 40 0 0.00 0.0 0 2025-12-15 3% 9 23.5 -170 41 0 0.00 0.0 0 2025-12-16 51 21 360 -44 29 0 0.00 00 0 2025-12-17 60 35 47.5 73 17 0 0.00 00 0 2025-12-18 59 a 53.5 13 5 11 0 L05 0.0 0 2025-12-19 49 28 38.5 43 26 0 0 02 0.0 0 2025-12-20 62 25 43.5 38 21 V 0.00 0.0 0 2025-12-21 55 42 4#5 90 16 0 000 00 0 2025-12-22 56 32 440 47 21 0 000 00 0 2025-12-23 65 55 600 208 5 0 0.00 0.0 0 2025-12-24 74 58 660 27.0 0 I 0.00 00 0 2025-12-25 67 57 620 231 3 0 0.00 00 0 2025-12-26 65 61 63.0 243 2 0 0.00 00 0 2025-12-27 " 54 600 214 5 0 0.00 0.0 0 2025-12-28 71 64 67 5 24.0 0 3 0.00 00 0 2025-12-29 69 26 47.) 9.2 17 0 018 00 0 2025-12-30 35 25 29.0 -92 36 0 0.00 00 0 2025-12-31 49 21 350 -31 30 0 0.00 00 0 Sum 1591 1035 - . 699 I 2.26 00 . Average 51.3 33.4 42.4 19 " . . # 00 Normal 504 306 40.5 . no 0 5.13 06 a Observations for each day cover the 24 hours ending at the time given below (Local Standard Time). Mux Temperature 8pm Min Temperature 8pm Precipitation 8pm Snowfall unknown Snow Depth 8pm 01 26 25 - WEATHER DELAY REPORT Month and Year SBC Project Number and Project Name: Reported Below: East Hickman Vocational Building January 2026 Weather condition Work scheduled on critical path for this day Date causing delay that was delayed. 1 2 3 4 5 6 7 8 9 Rain Day- 0.09 Underground Utilities/ grading site 10 Rain Day- 0.26 Underground Utilities/ grading site 11 Dry out day Underground Utilities/ grading site 12 Dry out day Underground Utilities/ grading site 13 14 Rain Day- 0.11 Underground Utilities/ grading site 15 Dry out day Underground Utilities/ grading site 16 Rain Day- 0.12 Underground Utilities/ grading site 17 Dry out day Underground Utilities/ grading site 18 19 20 21 Rain day 0.27 Underground Utilities/ grading site 22 Dry out day Underground Utilities/ grading site 23 24 Snow day- 2.00 Underground Utilities/ grading site 25 Snow day 1.30 Underground Utilities/ grading site 26 ice/ dry out day Underground Utilities/ grading site 27 ice/ dry out day Underground Utilities/ grading site 28 ice/ dry out day Underground Utilities/ grading site 29 ice/ dry out day Underground Utilities/ grading site 30 ice/ dry out day Underground Utilities/ grading site 31 ice/ dry out day Underground Utilities/ grading site Total number of days this month with delay due to weather 18 days Baseline number from Section 01 26 20 12 days Total - Baseline = claimable days 6 days END OF SECTION TN Higher Education - Standard Document - May 2018 Page 1 of 1 Climatological Data for DICKSON, TN - January 2026 Temperature Date HDD CDD Maximum Minimum Precipitation Average Departure 2026-01-01 61 26 43.5 55 21 0 0.00 2026-01-02 54 33 43.5 56 21 0 0.06 2026-01-03 47 33 400 22 25 0 0.05 2026-01-04 49 25 370 -07 18 0 0.00 2026-01-05 63 28 45 5 79 19 0 0.00 2026-01-06 65 48 56.5 190 8 0 0.00 2026-01-07 67 37 520 146 13 0 0.00 2026-01-08 69 37 530 156 12 0 0.00 2026-01-09 72 00 660 287 45 1 0.00 2020-01-10 60 42 53.0 117 14 0 026 2026-01-11 12 7. 15 5 -1.7 29 0 0.00 2026-01-12 49 20 14.5 -2.7 30 0 000 2026-01-13 62 28 45.0 78 20 0 0.00 2024-01-14 52 30 10 6 24 a 0.11 2026-01-15 32 20 2000 -111 10 a 0.00 2026-01-16 50 in 40 -31 31 ) 012 2026-01-17 41 R 115 16 31 0 0.00 2026-01-18 32 14 230 -14.2 42 0 0.00 2026-01-19 37 16 265 -107 38 0 0.00 2026-01-20 39 10 245 -127 40 0 000 2026-01-21 12 24 310 -43 2 0 027 2026-01-22 4% 10 140 no 27 0 0.00 2026-01-23 35 19 27.0 -104 38 0 0.00 2020-01-24 19 4 165 210 48 0 2.00 31 13 220 -150 HB 0 130 2026-01-26 31 7 190 417 IA @ 0.00 2026-01-27 29 5 The -20 48 a 0.00 2026-01-28 31 11 210 -169 +1 0 0.00 2026-01-29 : 14 25 5 -125 39 0 0.00 2026-01-30 29 17 210 -15.2 42 0 0.00 2026-01-31 " 12 165 -21 S 48 11 000 Sum 1394 746 . B 440 I 426 Average 45.0 241 345 -30 . . . Normal 475 27 5 37.5 . 853 0 433 Observations for each day cover the 24 hours ending at the time given below (Local Standard Time). Max Temperature 8pm Min Temperature 8pm Precipitation 8pm 01 26 25 - WEATHER DELAY REPORT Month and Year SBC Project Number and Project Name: Reported Below: East Hickman Vocational Building February 2026 Weather condition Work scheduled on critical path for this day Date causing delay that was delayed. 1 2 3 Rain Day- 0.38 Underground Utilities/ grading site 4 Dry out day Underground Utilities/ grading site 5 Dry out day Underground Utilities/ grading site 6 7 8 9 10 11 Rain Day- 0.46 Underground Utilities/ grading site 12 Dry out day Underground Utilities/ grading site 13 Dry out day Underground Utilities/ grading site 14 Rain Day- 0.08 Underground Utilities/ grading site 15 Rain Day- 1.67 Underground Utilities/ grading site 16 Dry out day Underground Utilities/ grading site 17 Dry out day Underground Utilities/ grading site 18 Dry out day 19 20 Rain day 0.31 Underground Utilities/ grading site 21 Dry out day Underground Utilities/ grading site 22 Dry out day Underground Utilities/ grading site 23 24 25 Rain day 0.15 Underground Utilities/ grading site 26 Rain day 0.30 Underground Utilities/ grading site 27 Dry out day Underground Utilities/ grading site 28 Dry out day Underground Utilities/ grading site 29 30 31 Total number of days this month with delay due to weather 18 days Baseline number from Section 01 26 20 11 days Total - Baseline = claimable days 7 days END OF SECTION TN Higher Education - Standard Document - May 2018 Page 1 of 1 Climatological Data for DICKSON, TN - February 2026 Temperature Date HDD CDD Maximum Precipitation Minimum Average Departure 2026-02-01 30 17 23.5 -150 41 0 0.00 2026-02-02 46 22 34.0 -4.6 31 0 0.00 2026-02-03 46 26 36.0 -2.8 29 0 0.38 2026-02-04 40 26 33.0 -60 32 0 0.00 2026-02-05 30 18 24.0 -15.2 41 0 0.00 2026-02-06 56 22 39.0 -04 26 0 0.00 2026-02-07 42 26 34.0 -5.6 31 0 0.00 2026-02-08 51 24 37.5 -23 27 0 0.00 2026-02-09 68 28 48.0 8.0 17 0 0.00 2026-02-10 73 34 53.5 133 11 0 0.00 2026-02-11 62 41 51.5 11.1 13 0 0.46 2026-02-12 53 31 42.0 14 23 0 0.00 2026-02-13 61 30 45.5 46 19 0 0.00 2026-02-14 59 30 44.5 34 20 0 0.08 2026-02-15 49 45 47.0 57 18 0 1.67 2026-02-16 66 34 50.0 84 15 0 0.00 2026-02-17 60 36 48.0 62 17 0 0.00 2026-02-18 61 56 58.5 164 6 0 0.00 2026-02-19 72 55 63.5 212 1 0 0.00 2026-02-20 70 48 59.0 164 6 0 036 2026-02-21 54 37 45.5 27 19 0 0.00 2026-02-22 37 27 32.0 -11.1 33 0 0.00 2026-02-23 30 18 24.0 -19.4 41 0 0.00 2026-02-24 50 15 32.5 -11.1 32 0 0.00 2026-02-25 60 44 52.0 8.1 13 0 0.15 2026-02-26 57 46 51.5 7.3 13 0 0.30 2026-02-27 67 34 50.5 6.1 14 () 0.00 2026-02-28 75 33 54.0 9.3 11 0 0.00 Sum 1525 903 - - 600 0 3.40 Average 54.5 32.3 43.4 20 - - - Normal 52.3 30.4 41.4 - 663 1 4.90 Observations for each day cover the 24 hours ending at the time given below (Local Standard Time). Max Temperature : 8pm Min Temperature : 8pm Precipitation : 8pm Climatological Data for DICKSON, TN - March 2026 Temperature Date HDD CDD Maximum Precipitation Minimum Average Departure 2026-03-01 65 42 53.5 8.5 11 0 0.00 2026-03-02 61 43 52.0 6.7 13 0 0.03 2026-03-03 70 53 61.5 15.9 3 0 0.00 2026-03-04 76 59 67.5 217 0 3 0.00 2026-03-05 73 58 65.5 194 0 1 0.00 2026-03-06 81 51 66.0 19.6 0 1 0.00 2026-03-07 75 56 65.5 188 0 1 0.50 2026-03-08 65 53 59.0 120 6 0 0.00 2026-03-09 72 43 57.5 10.2 7 0 0.02 2026-03-10 78 60 69.0 214 0 4 0.03 2026-03-11 73 52 62.5 14.6 2 0 0.56 2026-03-12 54 40 47,0 -11 18 0 0.08 2026-03-13 67 33 50.0 16 15 0 0.00 2026-03-14 77 40 58.5 9.8 6 0 0.00 2026-03-15 77 58 67.5 18.5 0 3 0.00 2026-03-16 72 32 52.0 2.7 13 0 0.95 2026-03-17 39 21 30.0 -196 35 0 0.00 2026-03-18 62 32 47.0 -2.9 18 0 0.00 2026-03-19 74 36 55.0 4.7 10 0 0.00 2026-03-20 80 43 61.5 10.9 3 0 0.00 2026-03-21 86 58 72.0 21.1 0 7 0.00 2026-03-22 87 63 75.0 23.8 0 10 0.00 2026-03-23 79 42 60.5 9.0 4 0 0.00 2026-03-24 69 41 55.0 32 10 0 0.00 2026-03-25 75 49 62.0 9,9 3 0 0.00 2026-03-26 83 59 71.0 18.6 0 6 0.00 2026-03-27 77 43 60.0 7.3 5 0 0.00 2026-03-28 60 35 47.5 -56 17 0 0.00 2026-03-29 72 35 53.5 0.1 11 0 0.00 2026-03-30 75 57 66.0 12.3 0 1 0,00 2026-03-31 78 63 70.5 16.5 0 6 0.00 Sum 2232 1450 - - 210 43 2.17 Average 72.0 46.8 59.4 10.0 - - - Normal 61.1 37.7 49.4 - 489 6 5.44 Observations for each day cover the 24 hours ending at the time given below (Local Standard Time). Max Temperature : 8pm Min Temperature : 8pm Precipitation : 8pm 01 26 25 - WEATHER DELAY REPORT Month and Year SBC Project Number and Project Name: Reported Below: East Hickman Vocational Building March 2026 Weather condition Work scheduled on critical path for this day Date causing delay that was delayed. 1 2 3 4 5 6 7 Rain Day- 0.50 Underground Utilities/ grading site 8 Dry out day Underground Utilities/ grading site 9 10 11 Rain Day- 0.56 Underground Utilities/ grading site 12 Rain Day- 0.08 Underground Utilities/ grading site 13 Dry out day Underground Utilities/ grading site 14 Dry out day Underground Utilities/ grading site 15 16 Rain day 0.95 Underground Utilities/ grading site 17 Dry out day Underground Utilities/ grading site 18 Dry out day Underground Utilities/ grading site 19 Dry out day Underground Utilities/ grading site 20 21 22 23 24 25 26 27 28 29 30 31 Total number of days this month with delay due to weather 10 days Baseline number from Section 01 26 20 8 days Total - Baseline = claimable days 2 days END OF SECTION TN Higher Education - Standard Document - May 2018 Page 1 of 1 01 26 25 - WEATHER DELAY REPORT Month and Year SBC Project Number and Project Name: Reported Below: East Hickman VOC Building April 2026 Weather condition Work scheduled on critical path for this day Date causing delay that was delayed. 1 2 3 Rain Day- 0.13 final grade/sidwalks 4 Rain Day- 0.57 final grade/sidwalks 5 Rain Day- 0.20 final grade/sidwalks 6 Dry out day final grade/sidwalks 7 Dry out day final grade/sidwalks 8 9 10 11 12 13 14 15 16 Rain Day- 0.24 final grade/sidwalks 17 Rain Day- 0.24 final grade/sidwalks 18 Dry out day final grade/sidwalks 19 Dry out day final grade/sidwalks 20 21 22 23 24 25 26 27 28 Rain Day- 2.18 final grade/sidwalks 29 Dry out day - 0.55 final grade/sidwalks 30 Dry out day final grade/sidwalks 31 Total number of days this month with delay due to weather 12 days Baseline number from Section 01 26 20 7days Total - Baseline = claimable days 5 days END OF SECTION TN Higher Education - Standard Document - May 2018 Page 1 of 1 Climatological Data for DICKSON, TN - April 2026 Temperature Date HDD CDD Maximum Minimum Precipitation Average Departure 2026-04-01 81 62 71.5 17.2 0 7 0.00 2026-04-02 80 66 73.0 18.4 0 8 0.00 2026-04-03 84 64 74.0 19.1 0 9 0,13 2026-04-04 77 61 69.0 13.7 0 4 0.57 2026-04-05 62 44 53.0 -2.6 12 0 0.20 2026-04-06 68 37 52.5 -3.4 12 0 0.00 2026-04-07 66 43 54.5 -1.7 10 0 0.00 2026-04-08 77 42 59.5 3.0 5 0 0.00 2026-04-09 76 54 65.0 82 0 0 0.00 2026-04-10 78 47 62.5 5.4 2 0 0.00 2026-04-11 79 52 65.5 8.1 0 I 0.00 2026-04-12 82 51 66.5 8.8 0 2 0.00 2026-04-13 76 63 69.5 11.5 0 5 0.04 2026-04-14 82 61 71.5 13.3 0 7 0.00 2026-04-15 84 59 71.5 13.0 0 7 0.00 2026-04-16 80 58 69.0 102 0 4 0.24 2026-04-17 82 55 68.5 94 0 4 0.24 2026-04-18 70 45 57.5 -1.9 7 0 0.08 2026-04-19 64 39 51.5 -8.1 13 0 0.00 2026-04-20 72 39 55.5 -4.4 9 0 0.00 2026-04-21 78 42 60.0 -0.2 5 0 0,00 2026-04-22 79 45 62.0 16 3 0 0.00 2026-04-23 80 49 64.5 3.8 0 0 0.00 2026-04-24 77 55 66.0 51 0 1 0.03 2026-04-25 78 60 69.0 7.8 0 4 0,00 2026-04-26 82 53 67.5 6.1 0 3 0.00 2026-04-27 81 56 68.5 6.8 0 4 0.00 2026-04-28 79 59 69.0 7.1 0 4 2.18 2026-04-29 67 61 64.0 19 I 0 0.55 2026-04-30 63 48 55.5 -6.9 9 0 0.00 Sum 2284 1570 - - 88 74 4.26 Average 761 52.3 64.2 5.6 - - - Normal 70.9 46.2 58.6 . 223 29 4.93 Observations for each day cover the 24 hours ending at the time given below (Local Standard Time). Observation times may have changed during this period. Max Temperature : 8pm, 7pm Min Temperature : 8pm, 7pm Precipitation : 8pm, 7pm FC FELLOWSHIP P.O. Box 310 CONSTRUCTION Bon Aqua, TN 37025 Phone: (615) 412-4446 Fax: (615) 412-4454 March 12, 2025 Lyle-Cook Martin Architects 310 Franklin St Clarksville TN, 37040 Re: East Hickman Vocational Building To whom it may concern: Fellowship Construction is requesting an 18 calendar days contract extension for the existing 8 inch fire line underneath the proposed building foundation. Construction was halted when bloodhound found the fire line on November 20th and a change order was given after a board meeting on December 3rd. It then took 5 days to excavate and encase 2 portions of the fire line in concrete. This halted the progress of construction because the existing fire line would be in the way of the concrete foundation. Fellowship Construction is requesting 30 day contract extension for moving the existing gas line from the foundation of the proposed building. The bi-weekly meeting was held on December 17th and we could not get an approved change order until the board meeting on January 12th it then took 3 days to move the gas line. This halted the progress of construction because the existing gas line would be in the way of the concrete foundation. Thank you, Mike Irwin Project Manager Enclosure: - Job delays LYLE.COOK.MARTIN ARCHITECTS East Hickman High School Project No 1402.1 Agricultural/Vocational Education Building Job Progress Meeting Minutes 17 Dec 25 Attending: Jennifer Turpin-HCS Cayla Moultin-HCS Toby Warren-HCS Mike Irwin-Fellowship Construction Jamie Irwin-Fellowship Construction Jeff Corlew- LCMA Work in Progress Topsoil stripped, building layout, and currently forming for reinforcement over the existing fire line with concrete placement planned for today. Items discussed 1. Informed Jennifer that 2-1"conduits provided from our new building to the existing building for fire alarm, fiber, intercom, etc. Discussed having school tech people at a future progress meeting with the contractor's electricians. 2. Reviewed existing utility lines encountered under the building pad. a. Storm line from the existing greenhouse. Decision was made to cap the line after it exists the greenhouse and place a cover over the existing floor drain in the storage area of the greenhouse. b. Existing gas line serving the existing greenhouse crossing the building pad will be redirected around the front of the building and be reconnected after the line exits our building footprint. C. Existing site lighting conduit also encountered under the Northeast corner of the building pad and must be rerouted to the light pole located 2 feet from the building corner. Contractor to provide the owner with pricing for the items above and a change order will be drafted for approval at the next school board meeting January 12, 2026. FC FELLOWSHIP P.O. Box 310 CONSTRUCTION Bon Aqua, TN 37025 Phone: (615) 412-4446 Fax: (615) 412-4454 April 28, 2026 Lyle-Cook Martin Architects 310 Franklin St Clarksville TN, 37040 Re: East Hickman Vocational Building To whom it may concern: Fellowship Construction is requesting an 27 calendar day contract extension for the discrepancy on the finish floor elevation. I sent an email on March 10th and we discussed it in the meeting on March 31st and the concrete sub-contractor started the additional spread footing on April 6th. Thank you, Mike Irwin Project Manager Enclosure: - Job delays ## Table 1 | PROJECT: (Name and address) | CONTRACT INFORMATION: | CHANGE ORDER INFORMATION: | | --- | --- | --- | | East Hickman High School Agricultural/Vocational Building 7700 TN-7 Lyles, TN | Contract For: Contruction Date: 10-24-2025 | Change Order Number: 004 Date: 05-06-2026 | | OWNER: (Name and address) Hickman County Schools 114 North Central Avenue, Suite 203 Centerville, TN 37033 | ARCHITECT: (Name and address) Lyle Cook Martin Architects 310 Franklin Street Clarksville, TN 37040 | CONTRACTOR: (Name and address) Fellowship Construction 2668 Spencer Mill Road Bon Aqua, TN 37025 | ## Table 2 | The original Contract Sum was | $ 580,000.00 | | --- | --- | | The net change by previously authorized Change Orders | $ 22,901.76 | | The Contract Sum prior to this Change Order was | $ 602,901.76 | | The Contract Sum will be unchanged by this Change Order in the amount of | $ 0.00 | | The new Contract Sum including this Change Order will be | $ 602,901.76 | ## Table 3 | BrodA.Martin | Clu | | | --- | --- | --- | | ARCHITECT (Signature) | CONTRACTOR June (Signature) | OWNER (Signature) | | Bradley A. Martin, III | Jin Irwin Pres. | | | (Printed name, title, and license number if required) | (Printed name and title) | (Printed name and title) | | May 7, 2026 | 5/8/2026 | | | Date | Date | Date | ## Table 4 | SBC Project Number and Project Name: | Month and Year Reported Below: | | --- | --- | | East Hickman Vocational Building | December 2025 | ## Table 5 | Date | Weather condition causing delay | Work scheduled on critical path for this day that was delayed. | | --- | --- | --- | | 1 | Rain Day- 0.12 | Underground Utilities/ grading site | | 2 | Rain Day- 0.55 | Underground Utilities/ grading site | | 3 | Dry out day | Underground Utilities/ grading site | | 4 | Rain Day- 0.34 | Underground Utilities/ grading site | | 5 | Dry out day | Underground Utilities/ grading site | | 6 | Dry out day | Underground Utilities/ grading site | | 7 | | | | 8 | | | | 9 | | | | 10 | | | | 11 | Dry out day | Underground Utilities/ grading site | | 12 | Dry out day | Underground Utilities/ grading site | | 13 | | | | 14 | | | | 15 | | | | 16 | | | | 17 | | | | 18 | Rain Day- 1.05 | Underground Utilities/ grading site | | 19 | Dry out day | Underground Utilities/ grading site | | 20 | Dry out day | Underground Utilities/ grading site | | 21 | Dry out day | Underground Utilities/ grading site | | 22 | | | | 23 | | | | 24 | | | | 25 | | | | 26 | | | | 27 | | | | 28 | | | | 29 | Rain day 0.18 | Underground Utilities/ grading site | | 30 | Dry out day | Underground Utilities/ grading site | | 31 | | | | | Total number of days this | month with delay due to weather 12 days | | | Baseline number from Section | 01 26 20 11 days | | | Total - Baseline = claimable | days 1 days | ## Table 6 | | | | Climatological | Data for DICKSON, | TN | - December | 2025 | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | Date | | Temperature | | | | | | | | | | Maximum | Minimum | Average | Departure | HDD | CDD | Precipitation | New Snow | Snow Depth | | 2025-12-01 | 41 | 23 | 320 | -11 5 | 33 | 0 | 0.12 | 00 | 0 | | 2025-12-02 | 35 | 26 | 30.5 | -127 | 34 | n | 0.55 | 00 | 0 | | 2025-12-03 | 40 | 25 | 32.5 | -10.5 | a | 0 | 000 | 00 | 0 | | 2025-12-04 | 35 | 29 | 320 | -108 | 33 | 0 | 0.34 | 00 | 0 | | 2025-12-05 | 32 | 31 | 315 | JIJ | 33 | 0 | 0.00 | 00 | D | | 2025-12-06 | 44 | 30 | 370 | -53 | 28 | 0 | 0.00 | 00 | 0 | | 2025-12-07 | 42 | 27 | 145 | -76 | 30 | 0 | 0.00 | 00 | 0 | | 2025-12-08 | 44 | 28 | 360 | -5.9 | 19 | 0 | 0.00 | 00 | 0 | | 2025-12-09 | 4b. | 21 | 345 | -72 | 30 | 0 | 0.00 | 00 | 0 | | 2025-12-10 | 53 | 37 | 450 | 35 | 20 | 0 | 0.00 | 0.0 | 0 | | 2025-12-11 | 42 | 22 | 320 | -9.3 | 33 | a | 0.00 | 00 | 0 | | 2025-12-12 | 55 | 34 | 44 5 | 34 | 20 | 0 | 0.00 | 00 | 0 | | 2025-12-13 | 51 | 31 | 410 | 01 | 24 | 0 | 0.00 | 00 | 0 | | 2025-12-14 | 38 | 12 | 250 | -15.7 | 40 | 0 | 0.00 | 0.0 | 0 | | 2025-12-15 | 3% | 9 | 23.5 | -170 | 41 | 0 | 0.00 | 0.0 | 0 | | 2025-12-16 | 51 | 21 | 360 | -44 | 29 | 0 | 0.00 | 00 | 0 | | 2025-12-17 | 60 | 35 | 47.5 | 73 | 17 | 0 | 0.00 | 00 | 0 | | 2025-12-18 | 59 | a | 53.5 | 13 5 | 11 | 0 | L05 | 0.0 | 0 | | 2025-12-19 | 49 | 28 | 38.5 | 43 | 26 | 0 | 0 02 | 0.0 | 0 | | 2025-12-20 | 62 | 25 | 43.5 | 38 | 21 | V | 0.00 | 0.0 | 0 | | 2025-12-21 | 55 | 42 | 4#5 | 90 | 16 | 0 | 000 | 00 | 0 | | 2025-12-22 | 56 | 32 | 440 | 47 | 21 | 0 | 000 | 00 | 0 | | 2025-12-23 | 65 | 55 | 600 | 208 | 5 | 0 | 0.00 | 0.0 | 0 | | 2025-12-24 | 74 | 58 | 660 | 27.0 | 0 | I | 0.00 | 00 | 0 | | 2025-12-25 | 67 | 57 | 620 | 231 | 3 | 0 | 0.00 | 00 | 0 | | 2025-12-26 | 65 | 61 | 63.0 | 243 | 2 | 0 | 0.00 | 00 | 0 | | 2025-12-27 | " | 54 | 600 | 214 | 5 | 0 | 0.00 | 0.0 | 0 | | 2025-12-28 | 71 | 64 | 67 5 | 24.0 | 0 | 3 | 0.00 | 00 | 0 | | 2025-12-29 | 69 | 26 | 47.) | 9.2 | 17 | 0 | 018 | 00 | 0 | | 2025-12-30 | 35 | 25 | 29.0 | -92 | 36 | 0 | 0.00 | 00 | 0 | | 2025-12-31 | 49 | 21 | 350 | -31 | 30 | 0 | 0.00 | 00 | 0 | | Sum | 1591 | 1035 | - | . | 699 | I | 2.26 | 00 | . | | Average | 51.3 | 33.4 | 42.4 | 19 | " | . | . | # | 00 | | Normal | 504 | 306 | 40.5 | . | no | 0 | 5.13 | 06 | a | ## Table 7 | SBC Project Number and Project Name: | Month and Year Reported Below: | | --- | --- | | East Hickman Vocational Building | January 2026 | ## Table 8 | Date | Weather condition causing delay | Work scheduled on critical path for this day that was delayed. | | --- | --- | --- | | 1 | | | | 2 | | | | 3 | | | | 4 | | | | 5 | | | | 6 | | | | 7 | | | | 8 | | | | 9 | Rain Day- 0.09 | Underground Utilities/ grading site | | 10 | Rain Day- 0.26 | Underground Utilities/ grading site | | 11 | Dry out day | Underground Utilities/ grading site | | 12 | Dry out day | Underground Utilities/ grading site | | 13 | | | | 14 | Rain Day- 0.11 | Underground Utilities/ grading site | | 15 | Dry out day | Underground Utilities/ grading site | | 16 | Rain Day- 0.12 | Underground Utilities/ grading site | | 17 | Dry out day | Underground Utilities/ grading site | | 18 | | | | 19 | | | | 20 | | | | 21 | Rain day 0.27 | Underground Utilities/ grading site | | 22 | Dry out day | Underground Utilities/ grading site | | 23 | | | | 24 | Snow day- 2.00 | Underground Utilities/ grading site | | 25 | Snow day 1.30 | Underground Utilities/ grading site | | 26 | ice/ dry out day | Underground Utilities/ grading site | | 27 | ice/ dry out day | Underground Utilities/ grading site | | 28 | ice/ dry out day | Underground Utilities/ grading site | | 29 | ice/ dry out day | Underground Utilities/ grading site | | 30 | ice/ dry out day | Underground Utilities/ grading site | | 31 | ice/ dry out day | Underground Utilities/ grading site | | | Total number of days this | month with delay due to weather 18 days | | | Baseline number from Section | 01 26 20 12 days | | | Total - Baseline = claimable | days 6 days | ## Table 9 | | | Climatological | Data for DICKSON, | TN - January 2026 | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | Date | | Temperature | | | | | | | | Maximum | Minimum | Average | Departure | HDD | CDD | Precipitation | | 2026-01-01 | 61 | 26 | 43.5 | 55 | 21 | 0 | 0.00 | | 2026-01-02 | 54 | 33 | 43.5 | 56 | 21 | 0 | 0.06 | | 2026-01-03 | 47 | 33 | 400 | 22 | 25 | 0 | 0.05 | | 2026-01-04 | 49 | 25 | 370 | -07 | 18 | 0 | 0.00 | | 2026-01-05 | 63 | 28 | 45 5 | 79 | 19 | 0 | 0.00 | | 2026-01-06 | 65 | 48 | 56.5 | 190 | 8 | 0 | 0.00 | | 2026-01-07 | 67 | 37 | 520 | 146 | 13 | 0 | 0.00 | | 2026-01-08 | 69 | 37 | 530 | 156 | 12 | 0 | 0.00 | | 2026-01-09 | 72 | 00 | 660 | 287 | 45 | 1 | 0.00 | | 2020-01-10 | 60 | 42 | 53.0 | 117 | 14 | 0 | 026 | | 2026-01-11 | 12 | 7. | 15 5 | -1.7 | 29 | 0 | 0.00 | | 2026-01-12 | 49 | 20 | 14.5 | -2.7 | 30 | 0 | 000 | | 2026-01-13 | 62 | 28 | 45.0 | 78 | 20 | 0 | 0.00 | | 2024-01-14 | 52 | 30 | 10 | 6 | 24 | a | 0.11 | | 2026-01-15 | 32 | 20 | 2000 | -111 | 10 | a | 0.00 | | 2026-01-16 | 50 | in | 40 | -31 | 31 | ) | 012 | | 2026-01-17 | 41 | R | 115 | 16 | 31 | 0 | 0.00 | | 2026-01-18 | 32 | 14 | 230 | -14.2 | 42 | 0 | 0.00 | | 2026-01-19 | 37 | 16 | 265 | -107 | 38 | 0 | 0.00 | | 2026-01-20 | 39 | 10 | 245 | -127 | 40 | 0 | 000 | | 2026-01-21 | 12 | 24 | 310 | -43 | 2 | 0 | 027 | | 2026-01-22 | 4% | 10 | 140 | no | 27 | 0 | 0.00 | | 2026-01-23 | 35 | 19 | 27.0 | -104 | 38 | 0 | 0.00 | | 2020-01-24 | 19 | 4 | 165 | 210 | 48 | 0 | 2.00 | | | 31 | 13 | 220 | -150 | HB | 0 | 130 | | 2026-01-26 | 31 | 7 | 190 | 417 | IA | @ | 0.00 | | 2026-01-27 | 29 | 5 | The | -20 | 48 | a | 0.00 | | 2026-01-28 | 31 | 11 | 210 | -169 | +1 | 0 | 0.00 | | 2026-01-29 | : | 14 | 25 5 | -125 | 39 | 0 | 0.00 | | 2026-01-30 | 29 | 17 | 210 | -15.2 | 42 | 0 | 0.00 | | 2026-01-31 | " | 12 | 165 | -21 S | 48 | 11 | 000 | | Sum | 1394 | 746 | . | B | 440 | I | 426 | | Average | 45.0 | 241 | 345 | -30 | . | . | . | | Normal | 475 | 27 5 | 37.5 | . | 853 | 0 | 433 | ## Table 10 | SBC Project Number and Project Name: | Month and Year Reported Below: | | --- | --- | | East Hickman Vocational Building | February 2026 | ## Table 11 | Date | Weather condition causing delay | Work scheduled on critical path for this day that was delayed. | | --- | --- | --- | | 1 | | | | 2 | | | | 3 | Rain Day- 0.38 | Underground Utilities/ grading site | | 4 | Dry out day | Underground Utilities/ grading site | | 5 | Dry out day | Underground Utilities/ grading site | | 6 | | | | 7 | | | | 8 | | | | 9 | | | | 10 | | | | 11 | Rain Day- 0.46 | Underground Utilities/ grading site | | 12 | Dry out day | Underground Utilities/ grading site | | 13 | Dry out day | Underground Utilities/ grading site | | 14 | Rain Day- 0.08 | Underground Utilities/ grading site | | 15 | Rain Day- 1.67 | Underground Utilities/ grading site | | 16 | Dry out day | Underground Utilities/ grading site | | 17 | Dry out day | Underground Utilities/ grading site | | 18 | Dry out day | | | 19 | | | | 20 | Rain day 0.31 | Underground Utilities/ grading site | | 21 | Dry out day | Underground Utilities/ grading site | | 22 | Dry out day | Underground Utilities/ grading site | | 23 | | | | 24 | | | | 25 | Rain day 0.15 | Underground Utilities/ grading site | | 26 | Rain day 0.30 | Underground Utilities/ grading site | | 27 | Dry out day | Underground Utilities/ grading site | | 28 | Dry out day | Underground Utilities/ grading site | | 29 | | | | 30 | | | | 31 | | | | | Total number of days this | month with delay due to weather 18 days | | | Baseline number from Section | 01 26 20 11 days | | | Total - Baseline = claimable | days 7 days | ## Table 12 | | | Climatological | Data for DICKSON, | TN - February 2026 | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | Date | | Temperature | | | | | | | | Maximum | Minimum | Average | Departure | HDD | CDD | Precipitation | | 2026-02-01 | 30 | 17 | 23.5 | -150 | 41 | 0 | 0.00 | | 2026-02-02 | 46 | 22 | 34.0 | -4.6 | 31 | 0 | 0.00 | | 2026-02-03 | 46 | 26 | 36.0 | -2.8 | 29 | 0 | 0.38 | | 2026-02-04 | 40 | 26 | 33.0 | -60 | 32 | 0 | 0.00 | | 2026-02-05 | 30 | 18 | 24.0 | -15.2 | 41 | 0 | 0.00 | | 2026-02-06 | 56 | 22 | 39.0 | -04 | 26 | 0 | 0.00 | | 2026-02-07 | 42 | 26 | 34.0 | -5.6 | 31 | 0 | 0.00 | | 2026-02-08 | 51 | 24 | 37.5 | -23 | 27 | 0 | 0.00 | | 2026-02-09 | 68 | 28 | 48.0 | 8.0 | 17 | 0 | 0.00 | | 2026-02-10 | 73 | 34 | 53.5 | 133 | 11 | 0 | 0.00 | | 2026-02-11 | 62 | 41 | 51.5 | 11.1 | 13 | 0 | 0.46 | | 2026-02-12 | 53 | 31 | 42.0 | 14 | 23 | 0 | 0.00 | | 2026-02-13 | 61 | 30 | 45.5 | 46 | 19 | 0 | 0.00 | | 2026-02-14 | 59 | 30 | 44.5 | 34 | 20 | 0 | 0.08 | | 2026-02-15 | 49 | 45 | 47.0 | 57 | 18 | 0 | 1.67 | | 2026-02-16 | 66 | 34 | 50.0 | 84 | 15 | 0 | 0.00 | | 2026-02-17 | 60 | 36 | 48.0 | 62 | 17 | 0 | 0.00 | | 2026-02-18 | 61 | 56 | 58.5 | 164 | 6 | 0 | 0.00 | | 2026-02-19 | 72 | 55 | 63.5 | 212 | 1 | 0 | 0.00 | | 2026-02-20 | 70 | 48 | 59.0 | 164 | 6 | 0 | 036 | | 2026-02-21 | 54 | 37 | 45.5 | 27 | 19 | 0 | 0.00 | | 2026-02-22 | 37 | 27 | 32.0 | -11.1 | 33 | 0 | 0.00 | | 2026-02-23 | 30 | 18 | 24.0 | -19.4 | 41 | 0 | 0.00 | | 2026-02-24 | 50 | 15 | 32.5 | -11.1 | 32 | 0 | 0.00 | | 2026-02-25 | 60 | 44 | 52.0 | 8.1 | 13 | 0 | 0.15 | | 2026-02-26 | 57 | 46 | 51.5 | 7.3 | 13 | 0 | 0.30 | | 2026-02-27 | 67 | 34 | 50.5 | 6.1 | 14 | () | 0.00 | | 2026-02-28 | 75 | 33 | 54.0 | 9.3 | 11 | 0 | 0.00 | | Sum | 1525 | 903 | - | - | 600 | 0 | 3.40 | | Average | 54.5 | 32.3 | 43.4 | 20 | - | - | - | | Normal | 52.3 | 30.4 | 41.4 | - | 663 | 1 | 4.90 | ## Table 13 | | | Climatological | Data for DICKSON, | TN - March 2026 | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | Date | | Temperature | | | | | | | | Maximum | Minimum | Average | Departure | HDD | CDD | Precipitation | | 2026-03-01 | 65 | 42 | 53.5 | 8.5 | 11 | 0 | 0.00 | | 2026-03-02 | 61 | 43 | 52.0 | 6.7 | 13 | 0 | 0.03 | | 2026-03-03 | 70 | 53 | 61.5 | 15.9 | 3 | 0 | 0.00 | | 2026-03-04 | 76 | 59 | 67.5 | 217 | 0 | 3 | 0.00 | | 2026-03-05 | 73 | 58 | 65.5 | 194 | 0 | 1 | 0.00 | | 2026-03-06 | 81 | 51 | 66.0 | 19.6 | 0 | 1 | 0.00 | | 2026-03-07 | 75 | 56 | 65.5 | 188 | 0 | 1 | 0.50 | | 2026-03-08 | 65 | 53 | 59.0 | 120 | 6 | 0 | 0.00 | | 2026-03-09 | 72 | 43 | 57.5 | 10.2 | 7 | 0 | 0.02 | | 2026-03-10 | 78 | 60 | 69.0 | 214 | 0 | 4 | 0.03 | | 2026-03-11 | 73 | 52 | 62.5 | 14.6 | 2 | 0 | 0.56 | | 2026-03-12 | 54 | 40 | 47,0 | -11 | 18 | 0 | 0.08 | | 2026-03-13 | 67 | 33 | 50.0 | 16 | 15 | 0 | 0.00 | | 2026-03-14 | 77 | 40 | 58.5 | 9.8 | 6 | 0 | 0.00 | | 2026-03-15 | 77 | 58 | 67.5 | 18.5 | 0 | 3 | 0.00 | | 2026-03-16 | 72 | 32 | 52.0 | 2.7 | 13 | 0 | 0.95 | | 2026-03-17 | 39 | 21 | 30.0 | -196 | 35 | 0 | 0.00 | | 2026-03-18 | 62 | 32 | 47.0 | -2.9 | 18 | 0 | 0.00 | | 2026-03-19 | 74 | 36 | 55.0 | 4.7 | 10 | 0 | 0.00 | | 2026-03-20 | 80 | 43 | 61.5 | 10.9 | 3 | 0 | 0.00 | | 2026-03-21 | 86 | 58 | 72.0 | 21.1 | 0 | 7 | 0.00 | | 2026-03-22 | 87 | 63 | 75.0 | 23.8 | 0 | 10 | 0.00 | | 2026-03-23 | 79 | 42 | 60.5 | 9.0 | 4 | 0 | 0.00 | | 2026-03-24 | 69 | 41 | 55.0 | 32 | 10 | 0 | 0.00 | | 2026-03-25 | 75 | 49 | 62.0 | 9,9 | 3 | 0 | 0.00 | | 2026-03-26 | 83 | 59 | 71.0 | 18.6 | 0 | 6 | 0.00 | | 2026-03-27 | 77 | 43 | 60.0 | 7.3 | 5 | 0 | 0.00 | | 2026-03-28 | 60 | 35 | 47.5 | -56 | 17 | 0 | 0.00 | | 2026-03-29 | 72 | 35 | 53.5 | 0.1 | 11 | 0 | 0.00 | | 2026-03-30 | 75 | 57 | 66.0 | 12.3 | 0 | 1 | 0,00 | | 2026-03-31 | 78 | 63 | 70.5 | 16.5 | 0 | 6 | 0.00 | | Sum | 2232 | 1450 | - | - | 210 | 43 | 2.17 | | Average | 72.0 | 46.8 | 59.4 | 10.0 | - | - | - | | Normal | 61.1 | 37.7 | 49.4 | - | 489 | 6 | 5.44 | ## Table 14 | SBC Project Number and Project Name: | Month and Year Reported Below: | | --- | --- | | East Hickman Vocational Building | March 2026 | ## Table 15 | Date | Weather condition causing delay | Work scheduled on critical path for this day that was delayed. | | --- | --- | --- | | 1 | | | | 2 | | | | 3 | | | | 4 | | | | 5 | | | | 6 | | | | 7 | Rain Day- 0.50 | Underground Utilities/ grading site | | 8 | Dry out day | Underground Utilities/ grading site | | 9 | | | | 10 | | | | 11 | Rain Day- 0.56 | Underground Utilities/ grading site | | 12 | Rain Day- 0.08 | Underground Utilities/ grading site | | 13 | Dry out day | Underground Utilities/ grading site | | 14 | Dry out day | Underground Utilities/ grading site | | 15 | | | | 16 | Rain day 0.95 | Underground Utilities/ grading site | | 17 | Dry out day | Underground Utilities/ grading site | | 18 | Dry out day | Underground Utilities/ grading site | | 19 | Dry out day | Underground Utilities/ grading site | | 20 | | | | 21 | | | | 22 | | | | 23 | | | | 24 | | | | 25 | | | | 26 | | | | 27 | | | | 28 | | | | 29 | | | | 30 | | | | 31 | | | | | Total number of days this | month with delay due to weather 10 days | | | Baseline number from Section | 01 26 20 8 days | | | Total - Baseline = claimable | days 2 days | ## Table 16 | SBC Project Number and Project Name: | Month and Year Reported Below: | | --- | --- | | East Hickman VOC Building | April 2026 | ## Table 17 | Date | Weather condition causing delay | Work scheduled on critical path for this day that was delayed. | | --- | --- | --- | | 1 | | | | 2 | | | | 3 | Rain Day- 0.13 | final grade/sidwalks | | 4 | Rain Day- 0.57 | final grade/sidwalks | | 5 | Rain Day- 0.20 | final grade/sidwalks | | 6 | Dry out day | final grade/sidwalks | | 7 | Dry out day | final grade/sidwalks | | 8 | | | | 9 | | | | 10 | | | | 11 | | | | 12 | | | | 13 | | | | 14 | | | | 15 | | | | 16 | Rain Day- 0.24 | final grade/sidwalks | | 17 | Rain Day- 0.24 | final grade/sidwalks | | 18 | Dry out day | final grade/sidwalks | | 19 | Dry out day | final grade/sidwalks | | 20 | | | | 21 | | | | 22 | | | | 23 | | | | 24 | | | | 25 | | | | 26 | | | | 27 | | | | 28 | Rain Day- 2.18 | final grade/sidwalks | | 29 | Dry out day - 0.55 | final grade/sidwalks | | 30 | Dry out day | final grade/sidwalks | | 31 | | | | | Total number of days this | month with delay due to weather 12 days | | | Baseline number from Section | 01 26 20 7days | | | Total - Baseline = claimable | days 5 days | ## Table 18 | | | Climatological | Data for DICKSON, | TN - April 2026 | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | Date | | Temperature | | | | | | | | Maximum | Minimum | Average | Departure | HDD | CDD | Precipitation | | 2026-04-01 | 81 | 62 | 71.5 | 17.2 | 0 | 7 | 0.00 | | 2026-04-02 | 80 | 66 | 73.0 | 18.4 | 0 | 8 | 0.00 | | 2026-04-03 | 84 | 64 | 74.0 | 19.1 | 0 | 9 | 0,13 | | 2026-04-04 | 77 | 61 | 69.0 | 13.7 | 0 | 4 | 0.57 | | 2026-04-05 | 62 | 44 | 53.0 | -2.6 | 12 | 0 | 0.20 | | 2026-04-06 | 68 | 37 | 52.5 | -3.4 | 12 | 0 | 0.00 | | 2026-04-07 | 66 | 43 | 54.5 | -1.7 | 10 | 0 | 0.00 | | 2026-04-08 | 77 | 42 | 59.5 | 3.0 | 5 | 0 | 0.00 | | 2026-04-09 | 76 | 54 | 65.0 | 82 | 0 | 0 | 0.00 | | 2026-04-10 | 78 | 47 | 62.5 | 5.4 | 2 | 0 | 0.00 | | 2026-04-11 | 79 | 52 | 65.5 | 8.1 | 0 | I | 0.00 | | 2026-04-12 | 82 | 51 | 66.5 | 8.8 | 0 | 2 | 0.00 | | 2026-04-13 | 76 | 63 | 69.5 | 11.5 | 0 | 5 | 0.04 | | 2026-04-14 | 82 | 61 | 71.5 | 13.3 | 0 | 7 | 0.00 | | 2026-04-15 | 84 | 59 | 71.5 | 13.0 | 0 | 7 | 0.00 | | 2026-04-16 | 80 | 58 | 69.0 | 102 | 0 | 4 | 0.24 | | 2026-04-17 | 82 | 55 | 68.5 | 94 | 0 | 4 | 0.24 | | 2026-04-18 | 70 | 45 | 57.5 | -1.9 | 7 | 0 | 0.08 | | 2026-04-19 | 64 | 39 | 51.5 | -8.1 | 13 | 0 | 0.00 | | 2026-04-20 | 72 | 39 | 55.5 | -4.4 | 9 | 0 | 0.00 | | 2026-04-21 | 78 | 42 | 60.0 | -0.2 | 5 | 0 | 0,00 | | 2026-04-22 | 79 | 45 | 62.0 | 16 | 3 | 0 | 0.00 | | 2026-04-23 | 80 | 49 | 64.5 | 3.8 | 0 | 0 | 0.00 | | 2026-04-24 | 77 | 55 | 66.0 | 51 | 0 | 1 | 0.03 | | 2026-04-25 | 78 | 60 | 69.0 | 7.8 | 0 | 4 | 0,00 | | 2026-04-26 | 82 | 53 | 67.5 | 6.1 | 0 | 3 | 0.00 | | 2026-04-27 | 81 | 56 | 68.5 | 6.8 | 0 | 4 | 0.00 | | 2026-04-28 | 79 | 59 | 69.0 | 7.1 | 0 | 4 | 2.18 | | 2026-04-29 | 67 | 61 | 64.0 | 19 | I | 0 | 0.55 | | 2026-04-30 | 63 | 48 | 55.5 | -6.9 | 9 | 0 | 0.00 | | Sum | 2284 | 1570 | - | - | 88 | 74 | 4.26 | | Average | 761 | 52.3 | 64.2 | 5.6 | - | - | - | | Normal | 70.9 | 46.2 | 58.6 | . | 223 | 29 | 4.93 | ## Table 19 | Bon | Aqua, TN 37025 | | --- | --- | | Phone: | (615) 412-4446 | | Fax: | (615) 412-4454 |